EVIDENCE FROM REAL LABORATORY WORK.

Our work ranges from specialist design and planning to complex integrated transformation. Each case shows the challenge, LTS's role and the evidence of what changed.

Outcome
40%

National Reference Laboratory Transformation

Improvement in turnaround time. ISO 15189 accreditation achieved.

Outcome
28%

Research Institute Laboratory Consolidation

Cost reduction delivered as three facilities were consolidated into one.

Outcome
67%

Regulatory Compliance & Performance Recovery

Reduction in out-of-specification rate. Regulatory standing restored within 6 months.

Filter by challenge
Specialist laboratory design and masterplanning program
Design & New Laboratories

Specialist laboratory design and masterplanning program

Biomedical Research Institute

$66.1M
Total Value
99%
Specialist Uptime
13
Departments

Challenge

Complex, multi-department research facility requiring coordination across 13 specialist areas, from Human Genetics to Reproductive Immunology, with overlapping needs and legacy infrastructure constraints.

Approach

End-user workshops, process flow mapping, and environmental forecasting enabled a consolidated laboratory masterplan. Full design from cadaver halls to BSL-3 labs using Revit, with value engineering embedded across both buildings.

Result

99% specialist uptime at handover. $66.1M total project value delivered on a 10-year timeline with minimal disruption to ongoing research.

Laboratory design and documentation program
Design & New Laboratories

Laboratory design and documentation program

G42 Healthcare

$5.4M
Investment
1,500 sqm
Lab Space
BSL-2/3
Containment

Challenge

High biosafety standards, complex equipment integration, automated sample handling, and AI-readiness all within a space that needed to be safe, scalable, and ready for rapid response to public health threats.

Approach

End-user workshops mapped operational flows and regulatory requirements. Detailed room data sheets, equipment specifications, and spatial calculations developed. Full documentation aligned with UAE regulations and international biosafety standards.

Result

1,500 sqm BSL-2/3 facility with AI-powered analysis and automated sampling. $5.4M investment positioning G42 at the forefront of preventative diagnostics across the MENA region.

Laboratory expansion and workflow redesign
Network & Consolidation

Laboratory expansion and workflow redesign

Tribal Diagnostics

2,300 sqm
Total Facility
10 years
Planning Horizon
Full BIM
Methodology

Challenge

Balancing current operational demands with future expansion without overbuilding or disrupting services. Each department had specific requirements for space, adjacency, and function within a flexible, scalable layout.

Approach

Remote workshops to gather operational intelligence, map workflows, and build future state scenarios. Revit and BIM workflows developed design concepts incorporating staff growth, volume projections, and logistics planning for 1-, 5-, and 10-year horizons.

Result

2,300 sqm total facility with 1,400 sqm of lab space designed for controlled, phased growth. Fully BIM-modeled lab design positioned for expansion across the US diagnostics landscape.

National biosafety pre-feasibility and design program
High Containment

National biosafety pre-feasibility and design program

National Health Laboratory Services

BSL-3/4
Containment Level
National
Scope

Challenge

Rwanda required a cutting-edge facility capable of hosting BSL-3 and future BSL-4 labs alongside molecular hubs, pathology labs, a blood bank, and training centers. No existing national-level pre-feasibility data was available.

Approach

Appointed by the WHO Rwanda Country Office, LTS led pre-feasibility studies, legal and regulatory framework analysis, risk assessments, user requirement specifications, and strategic design oversight for biosafety alignment.

Result

Project brief currently in development. The facility is positioned to become a cornerstone for national and regional disease preparedness, with sustainability planning and capability transfer embedded from the outset.

BSL-3 network upgrade program
High Containment

BSL-3 network upgrade program

National Health Research Laboratory

1,160 sqm
Lab Space
BSL-2 to BSL-3
Upgrade
REDISSE IV
Program

Challenge

Retrofitting and redesigning an existing BSL-2 facility for BSL-3 compliance, balancing technical standards, spatial limitations, and infrastructure constraints within a broader regional surveillance program.

Approach

Design upgrade and documentation for Angola's INIS lab. Workflow redesign, containment upgrades, and full tender documentation developed in partnership with local architects and specialist engineers aligned with BSL-3 standards.

Result

1,160 sqm of lab space upgraded from BSL-2 to BSL-3 under the REDISSE IV program. The facility now supports rapid response to epidemics and aligns Angola with ECCAS biosafety goals.

Pharmaceutical capacity expansion and design
Performance

Pharmaceutical capacity expansion and design

Aspen Pharmacare QC Laboratory

$4.8M
Investment
2,400 sqm
Lab Space
Multi-phase
Delivery

Challenge

Existing QC facilities operating near maximum capacity. Microbiology and Chemistry departments required space, efficiency, and improved sample flow, but construction had to be phased to avoid downtime and maintain GMP compliance.

Approach

Phased design with full MEP integration. Phase 1: new Microbiology facility with parking block and delivery routes. Phase 2: refurbishing and expanding Chemistry lab with seamless transition while lab remains active.

Result

Phase 1 Microbiology lab now live and operational. Phase 2 Chemistry expansion underway. $4.8M investment delivered with zero compromise on GMP compliance or business continuity.

Facility design and implementation program
Enterprise Transformation

Facility design and implementation program

SANBS Regional Lab & Donor Centre

$8.3M
Investment
3,200 sqm
Lab Space
Class B
Classification

Challenge

Converting a segmented former call center warehouse into a transparent, inclusive facility meeting GMP standards, with cleanroom Class B environment and clear visual links across departments.

Approach

Nucleus laboratory concept using space planning, internal screen technology, and process-led design. The laboratory sits at the center, both spatially and symbolically, creating openness and cohesion across departments.

Result

SANBS's first contemporary laboratory delivered. $8.3M investment creating 3,200 sqm of GMP-compliant lab space that visualizes the full Journey of Blood, linking lab performance with public trust.

Tissue bank refurbishment and laboratory design
Design & New Laboratories

Tissue bank refurbishment and laboratory design

Bone SA Tissue Bank

$1.1M
Investment
ISO 6
ISO Rating
Full BIM
Methodology

Challenge

Existing structure not designed for high-grade laboratory use. Required ISO 6 specifications, strict environmental control, and seamless equipment integration within the constraints of the existing building envelope.

Approach

Process-driven design rooted in user needs and regulatory compliance. End-user workshops, workflow mapping, BIM-led methodology with full Revit modeling. All furniture and materials specified to meet tissue banking and cleanroom demands.

Result

1,225 sqm refurbished facility with 400 sqm of ISO 6-rated lab space. $1.1M investment enabling Bone SA to process, preserve, and store human tissue under ISO 6-controlled conditions.