Laboratory Qualification & Certification
Formal verification that your laboratory was designed, installed and operates in line with the agreed requirements, with the documented evidence to show it. Available as a standalone engagement or as part of integrated LTS project delivery.
Discuss a qualification requirementDesign establishes compliant intent.
Qualification & Certification verifies that intent in practice and provides the documented evidence.
Closing the gap between what was specified and what was delivered.
Laboratory qualification is a structured process of verifying, stage by stage, that a facility meets the requirements agreed at the outset. It connects what was intended and specified with what was actually built, installed, commissioned and shown to perform.
Good laboratory design already embeds compliance principles, safety, workflow, operational requirements and relevant good practice. Qualification & Certification adds a different layer: formal verification, documented test results, deviation logs and audit-ready qualification and certification records.
Where typical design scope ends, and what qualification adds.
Design establishes compliant intent.
Qualification & Certification verifies that intent in practice and provides the documented evidence.
| Outcome | Typical design scope | Qualification & Certification |
|---|---|---|
| Fit-for-purpose design | Provided through design | Verified against agreed requirements |
| Compliance built into design | Provided through design | Verified against agreed requirements |
| Formal verification | Typically not included | Included |
| Documented test results | Typically not included | Included |
| Audit-ready evidence | Typically not included | Included |
| Qualification / certification record | Typically not included | Included |
Design services normally provide the compliant design intent. Formal qualification is separately scoped and verifies that intent against agreed requirements. It does not replace or repeat the design. Inclusions reflect the agreed qualification scope.
URS → DQ → IQ → OQ → PQ
The User Requirement Specification (URS) is the golden thread. Every later stage is verified against it, so requirements are traceable from definition through to a facility in use.
- URS
User Requirement Specification
BaselineDefines what the client requires. Developed and signed off as the baseline for every later stage.
- DQ
Design Qualification
VerificationVerifies the design against the URS before construction or installation proceeds.
- IQ
Installation Qualification
VerificationVerifies that the installed solution matches the approved design and requirements.
- OQ
Operational Qualification
VerificationVerifies operation and functional performance against defined criteria.
- PQ
Performance Qualification
Client-led, LTS supportConfirms the completed facility performs as required in use. PQ is client-led, with LTS guidance and support where applicable.
Not every laboratory requires the full sequence. The stages applied are defined by the agreed project scope.
Scope, where applicable to the agreed project scope.
Independent verification of the agreed requirements across the project can include layouts, HVAC, electrical, electronic and data systems, equipment-related requirements and other relevant building and services interfaces, as included in the engagement.
Where relevant to the specific facility, qualification is aligned with applicable requirements and frameworks such as ISO 14644, relevant SANS requirements, WHO requirements, GMP, GLP and BSL / biosafety principles. Applicability is confirmed per project.
- URS development and sign-off
- Design Qualification (DQ)
- Installation Qualification (IQ) and installation verification
- Operational Qualification (OQ)
- Performance Qualification (PQ) guidance and support
- Cleanroom performance testing, where applicable
- HVAC behaviour verification, where applicable
- Safety-function verification, where applicable
Nothing is corrected informally and forgotten.
When something fails, changes, is missed or is altered during design or installation, it is handled through formal change control so it cannot fall through the cracks between stages.
The cost of fixing failures later can be materially greater than the cost of verifying them earlier. Structured decision gates, documented pass/fail status and sign-offs reduce the risk of discovering failures late.
- Document the issue
- Log the deviation
- Identify the required action
- Carry the issue forward
- Verify the correction at the next relevant stage
- Confirm the final implementation reflects the required change
Evidence your quality team can use.
Deviation logs
Recorded deviations, required actions and follow-through status across the relevant stages.
Documented test results
Pass/fail status recorded against defined acceptance criteria.
Certification reporting
Formal reporting of verified performance against agreed requirements.
Qualification records
Stage-by-stage records from URS sign-off through qualification.
Audit-ready evidence packages
Structured evidence for quality departments, accreditation readiness and, where relevant, funders or investors.
Deliverables reflect the agreed project scope.
Ideally early. Possible at later stages.
- Ideally at the start, so the URS can anchor every later stage.
- Alongside design and implementation, with verification at each decision gate.
- As a standalone engagement for an existing project.
Where qualification starts late in a project, LTS can verify what is in place, but evidence from earlier stages cannot always be recreated in full.
Two ways to engage LTS.
Integrated
As part of an LTS design or project delivery scope, with qualification planned alongside design and implementation.
Standalone
Where LTS is engaged specifically for qualification and certification support. LTS does not need to have performed the original design.
Where independence is required, for example in Design Qualification on a project LTS has also designed, the delivery model can include independent specialist oversight, third-party review or separate verification support. Where independent verification is required, LTS can incorporate independent specialist oversight or third-party review into the agreed delivery model.
LTS does not accredit laboratories.
LTS is not an accreditation body and does not grant accreditation or regulatory approval. Laboratory Qualification & Certification supports accreditation readiness by providing structured qualification evidence and documented verification against agreed requirements, supporting the client's own quality, regulatory and accreditation processes.
Discuss a qualification or certification requirement.
Tell us about your facility, its stage and the evidence you need. A specialist will respond directly.
Discuss a qualification requirement